Our Ground

During the period of lock-down in 2020 we completed the construction of our impressive 100 seater stand. The stand and additional works at Roe Plas met the criteria required to achieve tier 3 status in the Welsh Alliance.

The flood in early 2020 caused significant damage to our pavilion including both changing rooms, kitchen and storage room. The Roe Plas pitch was also effected with debris from the floods causing signifcant damage to the grass as well as leaving tonnes of material to remove.

We are pleased to have completed the renovation work of the pavilion within several months and thanks to 360 Groundcare, the pitch has been recovered and looking in excellent condition for the start of the 2020/2021 season.